Aligned Data Centers is building Project Phoenix, a 2 GW data center campus spanning three facilities in the Shippingport Industrial Park, on the former Bruce Mansfield coal-fired power plant site in Beaver County. Aligned says the campus will use its own dedicated onsite power source rather than the local electrical grid and a closed-loop cooling system engineered to require zero water for operational cooling. Aligned closed on a 650.89-acre property in Shippingport in July 2026 and announced the groundbreaking on September 10, 2026.
Key facts
Size & schedule
| Planned capacity | 2 GW [1] company-stated campus capacity Source excerpt“today announced the groundbreaking of "Project Phoenix," a new 2 GW data center campus located in Shippingport, Pennsylvania.” |
|---|---|
| Site size | 650.89 acres [3] property purchased by Aligned Source excerpt“Aligned Data Centers, LLC closed the deal on a 650.89-acre property in Shippingport on Monday.” |
| Floor area | 2 million sq ft [3] 'nearly 2 million-square-foot' campus Source excerpt“a nearly 2 million-square-foot data center campus near the former Bruce Mansfield power plant for $223,150,865.38.” |
| Buildings | 3 [1]Source excerpt“Spanning three facilities, the development will meet robust regional demand for digital infrastructure while anchoring an estimated $10B in regional economic investment.” |
| Stated investment | $10 billion [1] estimated regional economic investment the campus would anchor (company-stated) Source excerpt“Spanning three facilities, the development will meet robust regional demand for digital infrastructure while anchoring an estimated $10B in regional economic investment.” |
| Permanent jobs (promised) | 640 [1] estimated Source excerpt“Project Phoenix will support an estimated 3,000 construction jobs and create an estimated 640 full-time careers for ongoing campus operations” |
| Construction jobs | 3,000 [1] estimated Source excerpt“Project Phoenix will support an estimated 3,000 construction jobs and create an estimated 640 full-time careers for ongoing campus operations” |
Power
| Power supply | Dedicated onsite power source rather than the local electrical grid [1]Source excerpt“Project Phoenix will use its own dedicated onsite power source rather than the local electrical grid.” |
|---|---|
| On-site generation type | natural gas-fired on-site power [6]Source excerpt“will run on its own on-site, natural gas-fired power rather than the PJM grid” |
Water
| Cooling | closed-loop system recycling deionized water; zero water for operational cooling (company-stated) [1]Source excerpt“Engineered to require zero water for operational cooling, each Project Phoenix data center utilizes an advanced closed-loop system that continuously recycles pure, deionized water.” |
|---|
Local decisions & site
| Parcel / address | Former Bruce Mansfield coal-fired power plant site, Shippingport Industrial Park [4]Source excerpt“the former Bruce Mansfield coal-fired power plant site in the Shippingport Industrial Park” |
|---|
Figures are as stated by the cited source. Where sources disagree, each figure is shown.
Timeline
DCD reports Aligned plans natural gas-powered data center buildings at the 660-acre Shippingport Industrial Park owned by Frontier Group of Companies [5]
Aligned closes purchase of a 650.89-acre property in Shippingport for $223,150,865.38 [3]
Aligned announces groundbreaking of the 2 GW Project Phoenix campus [1]
Issues raised
Sources
- Aligned Data Centers and Shippingport Community Mark Revitalization of Legacy Energy Site with Groundbreaking of 2 GW "Project Phoenix" CampusGlobeNewswire (Aligned Data Centers) · Sep 10, 2026 · company
- Aligned breaks ground on gigawatt-scale data center campus in PennsylvaniaDatacenterDynamics · Sep 17, 2026 · news
- Align Data Centers, LLC closes deal to build data center campus near former Bruce Mansfield power plant for just over $223 millionBeaver County Radio · Jul 29, 2026 · news
- Groundbreaking held for "The Project Phoenix" data center complex in ShippingportBeaver County Radio · Sep 14, 2026 · news
- Aligned looks to Pennsylvania, eyes two natural gas-powered facilities outside PittsburghDatacenterDynamics · Feb 3, 2026 · news
- Aligned Breaks Ground on $10B, 2 GW Data Center in Beaver CountyMarcellus Drilling News · Sep 11, 2026 · news