Who powers each project, as published. 79 of 101 projects have a documented utility, grid operator, generation plan or permit; 10 include on-site or dedicated generation.

By grid operator (where documented): PJM 3 · ERCOT 3 · MISO 2

ProjectUtility / gridOn-site generationBackup generators & air permitsUtility commission case
Fermi America Project Matador
Amarillo, Carson County, TX · 17 GW
Southwestern Public Service Company (Xcel Energy)Natural gas (3 Siemens SGT6-5000F turbines, up to 780 MW, delivered Sept 2026), four proposed Westinghouse AP1000 reactors, and solar plus battery storage
PORTS-Pike Technology Campus
Piketon, Pike County, OH · 10 GW
AEP Ohio (transmission partner)
PJM
At least 9.2 GW of new natural gas generation plus 765 kV transmission lines and four substations
Stratos Project
Box Elder County, UT · 9 GW
Self-contained natural gas generation isolated from Utah's grid, with battery storage and a 3,000-acre, 500 MW solar array plannedNo Notice of Intent submitted to Utah DEQ as of May 4, 2026; an Approval Order is required before construction
Monarch Compute Campus
Point Pleasant, Mason County, WV · 8 GW
On-site gas-fired microgrid: 864 natural gas reciprocating engines (2.16 GW) plus 120 additional natural gas/diesel engines for emergency power, fire suppression and heating
Comanche Circle
Tolar, Hood County, TX · 5 GW
Privately funded on-site natural gas generation plus grid (ERCOT) connectionNRG withdrew its air permit application for the 2 GW gas-fired Tolar Power Center, which would have supplied Comanche Circle, on June 18, 2026
Meta Hyperion
Holly Ridge, Richland Parish, LA · 5 GW
Entergy LouisianaEntergy gas generation: three combined-cycle plants (~3,000 MW) approved Aug. 2025, plus seven more gas plants, grid batteries and nuclear uprates proposed in 2026LPSC Docket U-37425 (three combined-cycle gas plants and transmission, approved Aug. 20, 2025)
LPSC Docket U-37882 (additional generation and transmission for the data center; set for Dec. 16, 2026 commission meeting)
Homer City Energy Campus
Homer City, Indiana County, PA · 4.4 GW
On-site natural gas plant: seven GE 7HA.02 combined-cycle turbines plus up to ten aeroderivative simple-cycle turbines; gas supply from EQT via Texas Eastern and Eastern Gas Transmission pipelinesTen 2.5 MW (3,633 bhp) and two 1.0 MW (1,483 bhp) diesel emergency generator engines, plus one 399 bhp diesel fire water pump engine
Project Camellia
Rincon, Effingham County, GA · 3.21 GW
Georgia Powerdiesel backup only (on-site emergency diesel generators; no regular on-site generation anticipated)
Project Tembo
Cheyenne, Laramie County, WY · 2.7 GW
Tallgrass BFC Power / Cheyenne Power Hub natural gas plants plus Black Hills Energy resources and fuel cells
Two combined cycle power plants plus temporary and permanent aeroderivative turbines and a fuel cell yard (BFC Power and Cheyenne Power Hub)
Project Jupiter
Santa Teresa, Doña Ana County, NM · 2.46 GW
on-site microgrid with Bloom Energy fuel cells (replacing an earlier gas-turbine plan)NMED air quality permit application by Yucca Growth Infrastructure for a fuel cell power system; public hearing scheduled to begin Oct. 19, 2026; NMED decision due by Nov. 23 (as scheduled in July 2026)
Quantum Frederick
Adamstown, Frederick County, MD · 2.4 GW
Aligned Data Centers: 168 diesel emergency generators rated 3,000 kW each with SCR, plus four 1,000 kW generators
MDE permit-to-construct for Aligned's emergency generators issued effective Jan. 30, 2025
Maryland PSC Order No. 90830 (Mail Log No. 302893): Aligned's CPCN exemption request for backup generators; provisional authorization limited to 70 MW
Project Tamarack
West Columbia, Mason County, WV · 2.16 GW
Appalachian Power (AEP)Existing grid via existing Appalachian Power/AEP infrastructure at the property
IREN Sweetwater data center campus
Sweetwater, Fisher County, TX · 2 GW
ERCOTERCOT grid; 345kV/138kV bulk substation at Sweetwater 1
Project Horizon
Fort Stockton, Pecos County, TX · 2 GW
On-site aero-derivative natural gas turbines with battery storage and grid interconnect, per Poolside
up to 1.2 GW initial
Project Phoenix
Shippingport, Beaver County, PA · 2 GW
Dedicated onsite power source rather than the local electrical grid
natural gas-fired on-site power
Joliet Technology Center
Joliet, Will County, IL · 1.8 GW
ComEd (developer-paid system upgrades)
PJM
xAI Colossus 2
Memphis, Shelby County, TN · 1.78 GW
Gas turbines at former Duke Energy plant in Southaven, MS (41 permanent turbines permitted, 1.2 GW; 69 temporary turbines reported by July 2026)Mississippi Environmental Quality Permit Board approved xAI's permit for permanent turbines on March 10, 2026, with all six members present voting in favor
Ridgeline Facility
Thomas, Tucker County, WV · 1.6 GW
On-site natural gas / diesel combustion turbines with heat recovery steam generators (off-grid microgrid); three 10-million-gallon diesel storage tanksWVDEP permit R13-3713 classifies the facility as a synthetic minor source, with physical and operational limits to stay below PSD major thresholds
T5 @ Chicago IV
Grayslake, Lake County, IL · 1.55 GW
ComEddiesel backup generation infrastructure
Vantage Frontier Campus
Albany, Shackelford County, TX · 1.4 GW
onsite natural gas microgrid, per Epoch AI
Behind-the-meter gas microgrid using Jenbacher reciprocating engines
700 MW
Saline Township Stargate Data Center
Saline Township, Washtenaw County, MI · 1.38 GW
DTE Electric
MISO
DTE existing resources plus 1,383 MW of DTE-owned battery storage14 diesel-fired emergency generators and 1 diesel fire water pump
EGLE air quality permit issued Jan. 13, 2026 for 14 diesel backup generators and one diesel firewater pump
MPSC Case No. U-21990
Port Washington (Lighthouse) Data Center Campus
Port Washington, Ozaukee County, WI · 1.3 GW
We Energies (transmission by American Transmission Co.)Developer says 70% of campus power from solar, wind and battery storage, with renewable purchases matching the restWDNR minor source construction permit 25-MIN-094 and initial operation permit 24618528A-F01 issued June 12, 2026 for 45 diesel-fired emergency generators
45 diesel-fired emergency generators
PSCW docket 137-CE-229 (ATC Ozaukee County Distribution Interconnection Project)
PSCW docket 6630-TE-113 (We Energies very large customer tariff; decision of May 21, 2026, challenged by Oracle)
Fort Meade Hyperscale Data Center
Fort Meade, Polk County, FL · 1.2 GW
Duke Energy
Project Marvel
Bessemer, Jefferson County, AL · 1.2 GW
Alabama Power
Stargate Abilene
Abilene, Taylor County, TX · 1.2 GW
ERCOTNatural gas, wind and solar
360 MW
Gas turbines (10 built; developers seek 41 more)
62 backup diesel generators (18 more proposed)
TCEQ Electric Generating Unit Standard Permit, Registration 177263 (Abilene DC 1, LLC, Longhorn Data Center): modification to five Titan 350 simple-cycle turbines at 38 MW each (and five GE LM2500 turbines at 34.1 MW each)
Stargate Milam County
Burlington, Milam County, TX · 1.2 GW
SB Energy plans new generation (and storage) to supply most of the campus's power
QTS Cedar Rapids Data Center Campus
Cedar Rapids, Linn County, IA · 1.05 GW
Alliant EnergyTemporary modular, self-contained generator units for construction and commissioning, expected to operate less than six months
Goodnight Campus
Claude, Armstrong County, TX · 1.03 GW
ERCOTERCOT grid; 265.5 MW Goodnight Wind Farm co-location; 933 MW of off-grid gas generationPUCT Docket No. 59220 (SB 6 net metering application for Crusoe Load Two, a 260 MW data center, with Goodnight Wind)
Global AI Data Center
Windsor, Weld County, CO · 1 GW
Poudre Valley Rural Electric Association (35 MW committed)
Meta El Paso Data Center
El Paso, El Paso County, TX · 1 GW
El Paso ElectricEl Paso Electric's proposed 366 MW McCloud gas plant ($473M, 813 Enchanted Rock modular generators) on 31 adjacent acres, dedicated to the data centerPUCT Docket 59076 (El Paso Electric McCloud Generation)
Meta Lebanon Data Center
Lebanon, Boone County, IN · 1 GW
134 MW
temporary natural gas-fired generators (65 requested in permit application; company expects about 32)
Life Cycle Power submitted an IDEM air emissions permit application in February for gas-fired generators
Meta Prometheus
New Albany, Franklin and Licking counties, OH · 1 GW
Behind-the-meter gas: Socrates South and Socrates North (200 MW each, built by Williams subsidiary Will-Power), plus the 250 MW Socrates the Younger plant with 116 MW batteries (approved June 2026); Meta also cited ~440 MW of Ohio solar
Polaris Forge 1
Ellendale, Dickey County, ND · 1 GW
Montana-Dakota Utilities
MISO
Grid power, which the company and city describe as excess wind powerND DEQ Air Pollution Control Permit to Construct ACP-18296 v1.0 (synthetic minor) for the ELN Generation Plant, 9663 87th Ave. SE, Ellendale; posted by DEQ as a draft
Project Boulder
Walterboro, Colleton County, SC · 1 GW
Would use roughly half the capacity of the proposed Canadys Station gas plant
Project Cannoli
Van Buren Township, Wayne County, MI · 1 GW
DTE EnergyDTE grid; Google-backed 1.6 GW of renewables and up to 480 MW of storage under 20-year contractsMPSC Case U-22058
Lake Mariner
Somerset, Niagara County, NY · 750 MW
About 90% hydropower from New York Power Authority, remainder NYSEG; dual 345 kV lines
CyrusOne Sangamon County Data Center
Waverly, Sangamon County, IL · 634 MW
Ameren Illinois / Rural Electric Convenience CooperativeGrid, with 420 diesel backup generators
Amazon Becker Data Center
Becker, Sherburne County, MN · 600 MW
Xcel EnergyAbout 250 Tier 4 diesel backup generators (250 kW to 2.75 MW each) proposedMinnesota PUC Docket No. PT7151/CN-24-435
Amazon Web Services Louisa County campuses
Louisa, Louisa County, VA · 600 MW
Rappahannock Electric Cooperative
CRG Festus Data Center
Festus, Jefferson County, MO · 600 MW
Ameren Missouri
Compass Statesville
Statesville, Iredell County, NC · 500 MW
Duke Energy40 backup generators per building
Stream Data Centers STAMP Campus
Alabama, Genesee County, NY · 500 MW
Direct connection to the 345kV bulk power system (company-stated)
Tooele Valley data center (Burmester Road / I-80)
Tooele County, UT · 500 MW
Natural gas line with 140 MW capacity; developer claims a letter of intent for a nuclear plant
Fleet Data Centers TRIC campuses (South Valley and Peru Ridge)
Storey County, NV · 362 MW
NV EnergyTemporary private natural gas and diesel engine plants for 2–3 years, then NV Energy permanent serviceAir quality permit applications for both gas plants submitted to the Nevada Division of Environmental Protection (as of April 2026)PUCN Docket 26-04026 (South Valley, 144 MW) and Docket 26-04027 (Peru Ridge, 218 MW)
Hut 8 River Bend Campus
St. Francisville, West Feliciana Parish, LA · 330 MW
Entergy Louisiana
Imperial Data Center
Imperial, Imperial County, CA · 330 MW
On-site substation, battery system, and natural gas generators for backup100 natural gas-powered backup emergency generators
CoreWeave Lancaster data center
Lancaster, Lancaster County, PA · 300 MW
PA DEP air quality permit for emergency diesel generators at 216 Greenfield Road; draft approval published in the Pennsylvania Bulletin on November 15, 2025
Google Botetourt County Data Center Campus
Botetourt County, VA · 300 MW
Appalachian PowerPower purchase agreement for the full output (79.3 MW) of the Rocky Forge Wind project
Nebius Vineland Data Center
Vineland, Cumberland County, NJ · 300 MW
About 85% on-site natural gas generation (including Bloom Energy fuel cells; proposed 1.5-million-gallon LNG tank), remainder from Vineland Municipal Utilities and Atlantic City Electric
62 on-site generators, at least 45 observed operating in August 2026
NJDEP: no permits issued and no applications under review for power generators at the DataOne facility (August 2026)
Earlier application: 32 natural gas engines (five for backup) and six diesel emergency generators; second phase now proposes Bloom Energy fuel cells
New Hill Digital Campus
Apex, Wake County, NC · 300 MW
Duke Energyabout 80 3-megawatt generators
Project Blue
Tucson, Pima County, AZ · 286 MW
Tucson Electric Power (TEP)
Golden Valley Technology Hub
Taft, Kern County, CA · 275 MW
Surplus power from CRC's natural gas-fired Elk Hills Power Plant; grid as limited backup14 diesel generators of 2.5 MW each, plus batteries
Core Scientific Denton Data Center
Denton, Denton County, TX · 260 MW
Denton Municipal ElectricBackup generators and heat exchangers on an additional 2.1 leased acres
QTS Fayetteville data center campus
Fayetteville, Fayette County, GA · 250 MW
Georgia Power
xAI Colossus
Memphis, Shelby County, TN · 250 MW
Memphis Light, Gas and Water (MLGW) / TVAMLGW/TVA grid plus on-site gas turbines (15 permitted, 247.2 MW) and Tesla Megapacks
Prime Phoenix Campus
Avondale, AZ · 240 MW
Dedicated on-site substation
250MW substation, Phase 1 commissioned
Utah Data Center
Bluffdale, Utah County, UT · 65 MW
Dedicated 65 MW power substation
Blueprint Taylor Data Center
Taylor, Williamson County, TX · 60 MW
OncorElectric grid, via an on-site electricity substationbackup power generators
Amazon Web Services Madison County Mega Site campus
Canton, Madison County, MS · —
Entergy MississippiOver 300 diesel generators at Canton (more than 700 across both Madison County campuses)
MDEQ permits issued for backup diesel generators, allowing up to 100 hours a year of maintenance and readiness testing
Amazon Web Services Richmond County data center campus
Hamlet, Richmond County, NC · —
Duke Energy
AWS Fayette County Data Center Campus
Jeffersonville, Fayette County, OH · —
AES OhioGrid; transmission infrastructure for first phase to exceed $22 million (per OCC filing)
Balico data center campus and gas plant
Chatham, Pittsylvania County, VA · —
On-site 3,500 MW natural gas power plant owned/operated by Balico, supplied via Mountain Valley Pipeline
Falls Township Innovation Campus
Falls Township, Bucks County, PA · —
72 diesel-fired emergency engines approved; 280 natural gas-fired backup generator engines (4,287 hp each) applied for
Five air and water discharge permits approved, including 72 diesel-fired emergency engines; separate application for 280 gas-fired engines drew 1,236 comments to DEP
Google Morgan County Data Center
Monrovia, Morgan County, IN · —
AES Indiana
Google West Memphis Data Center
West Memphis, Crittenden County, AR · —
Entergy ArkansasEntergy Arkansas grid; Google to support a new 600MW solar project with a 350MW battery system in Jefferson County
Howell Township Data Center
Howell, Livingston County, MI · —
DTE Energy
Meta Cheyenne Data Center
Cheyenne, Laramie County, WY · —
Cheyenne Light, Fuel & Power (Black Hills Energy)Black Hills Energy grid, with new resources including renewables (company-stated)
Microsoft Fairwater
Mount Pleasant, Racine County, WI · —
We EnergiesMicrosoft says it will match fossil-fuel power with carbon-free energy; 250 MW solar project in Portage County under constructionWDNR construction permit application 24-MIN-238 and operation permit revision 25230249A-F03 (six new and two revised data centers); public hearing Dec. 2, 2024
40 emergency generators and two emergency fire pumps at the 1.3 million sq ft facility; 39 backup generators at the existing facility
Microsoft Fairwater Atlanta
Fayetteville, Fayette County, GA · —
Utility grid only; no on-site generation or UPS, per Microsoft
Microsoft Gaines Township data center
Caledonia, Kent County, MI · —
Consumers Energy
Pennsylvania Digital 1 (PAX-1)
Middlesex Township, Cumberland County, PA · —
PPL Electric UtilitiesPPL Electric Utilities grid; 1.35 gigawatt peak energy demand with planned upgradesmore than 500 diesel generators
Project Cumulus
St. Charles, St. Charles County, MO · —
Backup generators with about 1 million gallons of diesel fuel stored in 150 tanks
Project Delta
Walnut Cove, Stokes County, NC · —
Duke EnergyGenerators initially, then Duke Energy grid connection (developer plan)
Project Flex
New Hudson, Oakland County, MI · —
DTE Energy (new substation required)Battery energy storage as primary backup for outages under 4 hours; packaged diesel generators in acoustic enclosures as secondary backup
Project Rainier (AWS New Carlisle campus)
New Carlisle, St. Joseph County, IN · —
Indiana Michigan Power (I&M)
Project Thunderbird
Enid, Garfield County, OK · —
3.3 GW
On-site natural gas-fueled generation, behind the meter, via partnership with a natural gas midstream energy provider
Salem Township Innovation Campus
Salem Township, Luzerne County, PA · —
PPL Electric Utilities (transmission and delivery); Talen Energy as retail power supplier
PJM
Susquehanna nuclear plant via a 1,920-MW Talen Energy power purchase agreement running through 2042FERC Docket ER24-2172 (amended Susquehanna interconnection service agreement)
Sentinel / Green Fig Data Center
Malvern, Chester County, PA · —
PECO (electric); Aqua (water)Diesel standby generators
Spring Valley Technology Park
Loudoun County, VA · —
Natural gas-powered hydrogen fuel cells with battery storage, plus three on-site substationsTier 4 generators enclosed on six sides (applicant commitment)

Values are as stated in each project’s sources; open a project for citations and source excerpts. A dash means nothing was found in the sources reviewed, not that none exists.