Claude, Armstrong County, TX
Goodnight Campus
Also known as Project Goodnight, Google Armstrong County data center
- Rumored
- Proposed
- Approved
- Under construction
- Operating
An AI data center campus south of the town of Claude in Armstrong County, Texas, begun by Crusoe and folded into Google's $40 billion Texas investment announced in November 2025. ABC 7 Amarillo reports Google will be a tenant; trade outlet New Project Media reports Crusoe agreed to sell the project to Google. The campus was scaled back in 2025 to three or four buildings; its power plan combines ERCOT grid service, the adjacent Goodnight Wind Farm and on-site gas turbines.
Key facts
Size & schedule
| Planned capacity | 1.03 GW [5] original plan: 530 MW phase 1 (four buildings) and 500 MW phase 2, per New Project Media |
|---|---|
| Phase 1 capacity | 530 MW [5] |
| Site size | 1,300 acres [1] |
| Floor area | 3.5 million sq ft [3] |
| Buildings | 4 [3] scaled back from 7 buildings to 3–4; 4 under construction as of Oct 2025 |
| Permanent jobs (promised) | 80 [1] 80 to 100 expected |
| Target completion | Late 2028 or early 2029 [1] |
Power
| Grid operator | ERCOT [8]Source excerpt“Building on that baseline, ERCOT's recommendation in Docket No. 59220 established a cumulative 525.5 MW curtailment obligation across the two data centers behind the single wind generating facility.” |
|---|---|
| Power supply | ERCOT grid; 265.5 MW Goodnight Wind Farm co-location; 933 MW of off-grid gas generation [6] |
| Utility commission case | PUCT Docket No. 59220 (SB 6 net metering application for Crusoe Load Two, a 260 MW data center, with Goodnight Wind) [8]Source excerpt“On July 24, 2026, the Public Utility Commission of Texas (PUCT) issued an order in Docket No. 59220 to approve a net metering application between a data center large load and a standalone generation resource.” |
Water
| Water source | Aquifer (groundwater), with recirculating cooling [3]Source excerpt“Hunt confirmed the data center will use a recirculating cooling system, limiting water use from the aquifer.” |
|---|---|
| Cooling | closed-loop / recirculating [1] |
Money & incentives
| Tax incentives | County tax abatement agreement with Crusoe Energy Systems LLC / GN DC1 LLC; amended Oct 2025 to $1.35 million per year per building once operational [3] |
|---|---|
| Abatement term | 10 years [3] original abatement term ($5.4 million per year per phase); amended Oct. 2025 Source excerpt“The original abatement was structured to provide $5.4 million per year for 10 years as each phase was completed, with a total of $10.8 million annually once both phases were operational.” |
Figures are as stated by the cited source. Where sources disagree, each figure is shown.
Timeline
Co-location application filed with Texas regulators under SB 6 rules [6]
Armstrong County Commissioners Court holds reinvestment zone hearing and considers tax abatements for Crusoe Energy Systems LLC / GN DC1 LLC [4]
Crusoe begins construction [1]
Commissioners unanimously approve amended abatement as project is scaled back to 3–4 buildings [3]
Google announces $40 billion Texas plan including a data center in Armstrong County [2]
Wind-powered portion of the campus sold to Ensign Infrastructure, which becomes the large load in the co-location application [6]
PUCT approves net metering application in Docket No. 59220 for the co-located Armstrong County data center load, with ERCOT curtailment obligations [8]
Issues raised
Sources
- Google announces new data center in Armstrong County, TexasABC 7 Amarillo · Nov 24, 2025 · news
- Google to build three new data centers in Texas in $40 billion investmentTexas Tribune · Nov 14, 2025 · news
- Armstrong County AI data center project scaled back from original planKFDA NewsChannel 10 · Oct 17, 2025 · news
- Notice of Meeting of the Armstrong County Commissioners' Court (Nov. 12, 2024)Armstrong County, Texas · Nov 12, 2024 · government
- Crusoe adds natural gas, storage to Texas Panhandle energy mix as project shifts to Google ownershipNew Project Media · news
- How a Crusoe-Google campus became Texas' co-location test caseLatitude Media · Apr 3, 2026 · news
- Texas – Google Data Center LocationGoogle · company
- PUCT affirms curtailment authority over co-located data centers in first net metering case under Senate Bill 6White & Case LLP · Aug 5, 2026 · other