Data Center Census

Company

Crusoe data center projects

Crusoe is linked to 2 tracked projects in Texas, totaling 2.23 GW of planned capacity. Role: developer.

ProjectStatusCapacityDeveloperLast update
Goodnight Campus
Claude, Armstrong County, TX
Under construction 1.03 GW Crusoe Jul 24, 2026
Stargate Abilene
Abilene, Taylor County, TX
Operating 1.2 GW Crusoe, Oracle Sep 2, 2026

Recent changes

  1. Stargate Abilene TX
    Chamber panel addresses resident concerns over housing, power, water and noise KACU
  2. Goodnight Campus TX
    PUCT approves net metering application in Docket No. 59220 for the co-located Armstrong County data center load, with ERCOT curtailment obligations White & Case LLP
  3. Stargate Abilene TX
    Buildings 3-4 become operational, bringing IT power to about 421 MW, per Epoch AI satellite analysis Epoch AI
  4. Stargate Abilene TX
    Lancium and Crusoe brief Abilene leaders; construction expected to run through Q1 2027 KTXS
  5. Goodnight Campus TX
    Wind-powered portion of the campus sold to Ensign Infrastructure, which becomes the large load in the co-location application Latitude Media
  6. Goodnight Campus TX
    Google announces $40 billion Texas plan including a data center in Armstrong County Texas Tribune
  7. Stargate Abilene TX
    Crusoe tops out final (eighth) building DatacenterDynamics
  8. Goodnight Campus TX
    Commissioners unanimously approve amended abatement as project is scaled back to 3–4 buildings KFDA NewsChannel 10

This page lists projects in the Census where Crusoe is named as developer by a cited source. It is not a complete list of the company’s facilities.