Taft, Kern County, CA
Golden Valley Technology Hub
Also known as CRC Elk Hills data center, Taft data center
ProposedPermits filed with Kern County June 2026; conditional use permit and environmental review pending. No annexation found
- Rumored
- Proposed
- Approved
- Under construction
- Operating
California Resources Corp. (CRC) and Beacon Data Centers propose the Golden Valley Technology Hub on CRC’s Elk Hills oil field property outside Taft in Kern County. It would run on power from CRC’s existing Elk Hills gas-fired power plant, with the grid as limited backup, and use closed-loop cooling. The project needs a county conditional use permit and environmental review; reported sizes differ widely between outlets.
Key facts
Size & schedule
| Planned capacity | 275 MW [1] per Bakersfield Californian; Taft Midway Driller reports 25 MW |
|---|---|
| Site size | 90 acres [3] Driller; 23ABC reports 100 acres |
| Floor area | 400,000 sq ft [2] per 23ABC; Driller reports 40,000 sq ft |
| Permanent jobs (promised) | 250 [1] up to |
| Construction jobs | 1,500 [1] at peak |
Power
| Power supply | Surplus power from CRC's natural gas-fired Elk Hills Power Plant; grid as limited backup [1] |
|---|---|
| Backup generators | 14 diesel generators of 2.5 MW each, plus batteries [1] as proposed Source excerpt“Beacon said it would make sure utility ratepayers pay nothing toward the project's power-related demands by proposing back-up power in the form of batteries and a series of 14 2.5-megawatt diesel-powered electrical generators, plus a power-grid connection the center wouldn't plan to use frequently.” |
Water
| Cooling | closed-loop, non-evaporative [1] 500,000-gallon initial fill, ~5,000 gallons/year top-off per CRC |
|---|
Local decisions & site
| Nearest homes or schools | About a mile and a half from the nearest home [1]Source excerpt“It would be cooled not by evaporation but a recirculating water system on an existing industrial site a mile and a half from the nearest home.” |
|---|
Figures are as stated by the cited source. Where sources disagree, each figure is shown.
Timeline
Issues raised
Sources
- CRC proposes W. Kern data center with dedicated power, closed-loop coolingThe Bakersfield Californian · Jun 15, 2026 · news
- Massive AI data center proposed for Kern County's Elk Hills23ABC News (KERO) · Jun 24, 2026 · news
- CRC holds informational meetings on proposed data centerTaft Midway Driller · Aug 27, 2026 · news
- Golden ValleyGolden Valley Technology Hub (CRC / Beacon) · 2026 · company
- Data center proposed in Inyokern and now TaftKBAK/KBFX Eyewitness News · Jun 17, 2026 · news