Data center rules: local ordinances, noise limits and state laws

29 rules that apply specifically to data centers across 11 states: 21 local ordinances, moratoriums and noise standards, and 8 state laws and utility orders. Each provision links to its source.

29 rules

Arizona

Tucson, Arizona · Water

Ordinance regulating large quantity water users

adopted Aug 19, 2025

  • Defines large users as ~7.5 million gallons per month.
    Source excerpt
    “Large quantity users are defined as those using 10,000 centum cubic which is equivalent to about 7.5 million gallons of water per month on average.”
  • Requires a conservation plan with the water service application.
    Source excerpt
    “Large quantity customers will be required to submit a conservation plan with their water service application.”
  • Requires recycled water to offset at least 30% of use.
    Source excerpt
    “agree to use recycled water to offset at least 30% of water use”

Source: AZPM, 2025-08-21

Phoenix, Arizona · Zoning

Zoning Ordinance update for data centers

adopted Jul 2, 2025

  • Council approved zoning updates adding data centers as a permitted use subject to a special permit addressing health and safety.
    Source excerpt
    “The Phoenix Mayor and City Council today approved updates to modernize the City's Zoning Ordinance to add data centers as a permitted use that must address health and safety concerns when applying for a special permit for construction.”

Source: City of Phoenix, 2025-07-02

Chandler, Arizona · Zoning

Ordinance No. 5033 (data center zoning amendment)

in effect Jan 5, 2023

  • Council unanimously approved Dec. 5, 2022; effective Jan. 5, 2023.
    Source excerpt
    “The ordinance was unanimously approved on Dec. 5, 2022 and took effect on Jan. 5.”
  • Clarifies data centers as a primary use only permitted in Planned Area Development (PAD) zoning designations.
    Source excerpt
    “Clarifies data centers as a primary use only permitted in planning area development (PAD) zoning designations”
  • Requires annual noise studies during peak operation for five years after construction is complete.
    Source excerpt
    “conduct an annual noise study during peak operation times for five years once construction of the data center is complete”
  • Establishes time limitations and notification protocol for routine backup generator maintenance and testing.
    Source excerpt
    “Establishes backup generator routine maintenance and testing time limitations, including notification protocol”

Source: City of Chandler, 2023-01-11

Georgia

Coweta County, Georgia · Moratorium

180-day data center moratorium (2026)

in effect Jun 16, 2026

  • Approves a 180-day moratorium to review the data center ordinance.
    Source excerpt
    “The Coweta County Board of Commissioners approved a 180-day data center moratorium to review the county's data center ordinance at its Tuesday night meeting.”
  • Halts acceptance of data center applications and hearings.
    Source excerpt
    “The moratorium will prevent the acceptance of applications for permits, land use amendments, rezoning or conditional use applications, variance applications and all public hearings related to data centers.”
  • Expires Dec. 23 or on adoption of an ordinance amendment.
    Source excerpt
    “It is set to expire on Dec. 23 or until the board adopts an amendment to the ordinance.”

Source: The Newnan Times-Herald, 2026-06-17

Coweta County, Georgia · Zoning

Coweta County data center ordinance

adopted Dec 2025

  • Keeps the 300-foot buffer requirement.
    Source excerpt
    “Staff concluded that the majority did not see fit to further adjust the 300-foot buffer requirement”
  • Guidelines address concerns including utility usage by data center facilities.
    Source excerpt
    “The approved guidelines address several concerns, including utility usage by data center facilities.”

Source: 95.5 WSB, 2025-12-17

Clayton County, Georgia · Moratorium

Clayton County 120-day data center moratorium

adopted Sep 3, 2025

  • The Board of Commissioners voted on Sept. 3, 2025 to impose a 120-day moratorium on data centers until Dec. 31, 2025.
    Source excerpt
    “On Sept. 3, the Clayton County Board of Commissioners voted to impose a 120-day moratorium on data centers until Dec. 31.”

Source: Georgia Public Broadcasting, 2025-10-22

Atlanta, Georgia · Zoning

Ordinances prohibiting data centers in the BeltLine Overlay and near high-volume transit

adopted Sep 3, 2024

  • Bans data centers along and near the BeltLine and within a half-mile of MARTA stations.
    Source excerpt
    “The Atlanta City Council voted Tuesday, Sept. 3, to ban data centers along and near the Atlanta BeltLine and within a half-mile of MARTA stations.”

Source: Georgia Public Broadcasting, 2024-09-04

Bartow County, Georgia · Noise

Bartow County data center ordinance

adopted

  • Limits sound to below 65 decibels (8 a.m.–6 p.m.) and 55 decibels (6 p.m.–8 a.m.) over 30-minute periods.
    Source excerpt
    “65 decibels or more over any 30-minute period from 8:00 a.m. to 6:00 p.m., or 55 decibels over any 30-minute period from 6:00 p.m. to 8:00 a.m.”

Source: Georgia Public Broadcasting, 2025-10-22

Indiana

Indiana · Power & rates

House Bill 1007 (2025), energy generation resources

passed Apr 2025 · Sent to the governor as of an April 23, 2025 report

  • Expedites approval for large-load customers like data centers.
    Source excerpt
    “expedite approval processes for large-load customers like data centers and create cost recovery mechanisms for projects utilities take on to serve those big customers”
  • Requires financial assurances reimbursing at least 80% of costs.
    Source excerpt
    “reimbursing at least 80% of costs and protecting other existing and future customers from the expenses”

Source: Indiana Capital Chronicle, 2025-04-23

Michigan

Michigan · Tax

Public Act 207 of 2024 (HB 4906): data center sales and use tax exemption

adopted Jan 17, 2025 · Signed January 17, 2025

  • Extends the qualified data center sales and use tax exemption through Dec. 31, 2050.
    Source excerpt
    “through December 31, 2050, for qualified data centers”
  • Enterprise data centers must make a $250 million capital investment.
    Source excerpt
    “specific criteria, including a $250 million capital investment”
  • Requires at least 30 full-time jobs paying 150% or more of the local prosperity region's median wage.
    Source excerpt
    “the creation of at least 30 full-time jobs paying 150% or more of the local prosperity region's median wage”
  • Qualification requires certification under at least one recognized green building standard and sourcing 90% of electricity usage from renewable energy.
    Source excerpt
    “stringent environmental standards, including certification under at least one recognized green building standard and sourcing 90% of electricity usage from renewable energy”
  • No new certificates will be issued after Dec. 31, 2029.
    Source excerpt
    “No new certificates will be issued after December 31, 2029.”

Source: Ryan LLC, 2025-01-28

Wixom, Michigan · Moratorium

Resolution Imposing a Temporary Moratorium on data centers

adopted Mar 24, 2026

  • Six-month moratorium on establishing, permitting and constructing data centers.
    Source excerpt
    “approved a Resolution Imposing a Temporary Moratorium for a period of six (6) months on the establishing, permitting, consideration, approval, location, construction, and/or installation of any data centers”

Source: City of Wixom

Big Rapids Charter Township, Michigan · Moratorium

Big Rapids Charter Township Data Center Moratorium Ordinance

adopted Feb 23, 2026

  • One-year moratorium on permitting and construction of all data centers, extendable by resolution.
    Source excerpt
    “a temporary moratorium on the permitting, consideration, approval, location, erection, construction, review, and/or installation of all Data Centers in the Township for one year, subject to six month or less extensions by resolution”
  • Adopted at a Feb. 23, 2026 township meeting.
    Source excerpt
    “on the 23rd day of February, 2026, at 5:00 p.m.”

Source: Big Rapids Charter Township, 2026-02-23

Lenox Township, Michigan · Moratorium

Lenox Township data center moratorium

adopted Feb 2, 2026

  • Moratorium on new data center development effective Feb. 2, 2026.
    Source excerpt
    “formally adopted a moratorium on new data center development effective February 2, 2026.”
  • Four months with one optional four-month extension.
    Source excerpt
    “The Township adopted a four-month moratorium, with the option for one additional four-month extension if necessary.”

Source: Charter Township of Lenox, 2026-02-03

Minnesota

Minnesota · State law

Laws of Minnesota 2025, First Special Session, Chapter 12 (HF 16): data center provisions

in effect Jun 14, 2025 · Signed June 14, 2025; the data center sections took effect the following day

  • Defines data center as a facility designed for a load of 100 MW or more.
    Source excerpt
    “a facility that is designed to have a load of 100 megawatts or more”
  • Special water permit conditions where new consumptive use exceeds 100 million gallons per year.
    Source excerpt
    “proposed new or additional consumptive use exceeds 100,000,000 gallons per year”
  • Utility tariffs must protect other customers from stranded costs.
    Source excerpt
    “contain protections necessary to ensure that other customers of the public utility are not placed at risk for paying stranded costs”

Source: Minnesota Office of the Revisor of Statutes, 2025-06-14

Ohio

Ohio (AEP Ohio service territory) · Power & rates

PUCO order approving AEP Ohio data center tariff

approved Jul 9, 2025 · PUCO order issued July 9, 2025; tariff takes effect when AEP Ohio files final tariffs

  • Applies to new data center loads over 25 MW.
    Source excerpt
    “new loads greater than 25 megawatts in the aggregate”
  • Minimum billing up to 85% of contracted capacity.
    Source excerpt
    “a maximum of 85% of contracted-for capacity”
  • Minimum contract length of eight years after load ramp.
    Source excerpt
    “a minimum contract length of eight years after the end of the load ramp period”
  • Exit fee equal to three years of minimum charges.
    Source excerpt
    “an 'exit fee' equal to three years of minimum charges”
  • Ends AEP Ohio's moratorium on new data center customers.
    Source excerpt
    “requires AEP Ohio to end its moratorium on signing up new data center customers”

Source: Vorys, 2025-07-11

Oregon

Oregon · Power & rates

House Bill 3546 (2025), the POWER Act

adopted Jun 2025

  • Directs the PUC to create a separate rate class for data centers over 20 MW.
    Source excerpt
    “The POWER Act, HB 3546 (2025), directs the PUC to create a separate rate class for data centers over 20 megawatts (MW).”
  • The new rate class's tariff schedule must directly assign costs of serving large energy use facilities to those consumers and mitigate cost shifting to other rate classes.
    Source excerpt
    “The bill outlines specific requirements for the tariff schedule, including that it must directly assign costs of serving large energy use facilities to those consumers and mitigate risks of cost shifting to other rate classes.”
  • Directs the PUC to require utilities serving large energy use facilities to sign contracts with them of 10 years or longer.
    Source excerpt
    “The Act also directs the PUC to require electric utilities serving large energy use facilities to enter into a contract with the consumer and spells out certain requirements for these contracts, including that they be for a duration of 10 years or longer.”

Source: Oregon Public Utility Commission, 2026

Pennsylvania

Doylestown Township, Pennsylvania · Zoning

Doylestown Township data center zoning ordinance

proposed

  • Minimum 100-foot setback, 200 feet next to residential.
    Source excerpt
    “minimum 100-foot setback, increasing to 200 feet when a facility borders residential property”
  • Violators given 30 days to correct noise problems.
    Source excerpt
    “30 days to correct the problem”
  • Could be considered for adoption in October 2026.
    Source excerpt
    “could be considered for adoption in October if the review and advertisement process remains on schedule”

Source: Central Bucks Now, 2026-08-24

Texas

Texas · State law

Senate Bill 6 (89th Legislature): large electrical loads

in effect Jun 2025 · Signed June 2025; sources give June 20 or June 21

  • Uniform large load interconnection standards apply to large loads of 75 MW and above unless PUCT sets a lower threshold.
    Source excerpt
    “Texas Senate Bill 6 (SB 6) took immediate effect upon Gov. Greg Abbott's signature on June 21, 2025”
  • Sets a flat study fee of at least $100,000 for initial transmission screening studies.
    Source excerpt
    “Establish a flat study fee of at least $100,000 for initial transmission screening studies, with provisions for additional fees if more capacity is requested.”
  • PUCT must establish a formal review process for new large loads seeking net metering with co-located existing generators.
    Source excerpt
    “The PUCT must establish a formal review process for new large loads seeking net metering with co-located existing generators.”
  • Mandates curtailment capabilities for noncritical large loads during firm load shed events.
    Source excerpt
    “SB 6 also mandates curtailment capabilities for noncritical large loads during firm load shed events and allows ERCOT to issue emergency notices requiring large loads with backup generation to reduce load or deploy their own generation.”

Source: McGuireWoods, 2025-07-10

Virginia

Virginia · State law

HB 153 / SB 94 (2026 Acts of Assembly, Chapters 567 and 568): data center site assessments

in effect Jul 1, 2026

  • Applies to facilities anticipated to need 100 MW or more.
    Source excerpt
    “100 megawatts or more of electrical power”
  • Requires a site assessment of the facility's sound profile on residences and schools within 500 feet.
    Source excerpt
    “the facility's sound profile on residential units and schools within 500 feet of the property boundary”
  • Requires disclosure of substations and transmission voltage.
    Source excerpt
    “any new or existing substations that will serve it and the anticipated transmission voltage required”
  • Signed by Gov. Abigail Spanberger and codified at Code of Virginia § 15.2-2209.5; effective July 1, 2026.
    Source excerpt
    “The operative language is now § 15.2-2209.5 of the Code of Virginia, enacted as 2026 Chapters 567 and 568 ... Gov. Abigail Spanberger signed the 2026 version, and her office lists it among the new laws taking effect July 1”

Source: Roanoke Rambler, 2026-09-16

Virginia · Tax

Data center electricity consumption tax (2026-2028 biennial budget)

pending Jun 2026 · Passed by the General Assembly in the 2026–2028 budget and sent to the governor, as of a June 22, 2026 report

  • Would charge $0.011 per kWh on all electricity consumed at each data center, on a monthly basis.
    Source excerpt
    “That consumption tax will be charged at a rate of $0.011 per kilowatt hour on all electricity consumed at each center on a monthly basis.”
  • Revenue would be capped at $600 million per year to the general fund, with the excess refunded to companies pro rata.
    Source excerpt
    “The consumption tax would be capped at $600 million in revenue to Virginia's general fund per year, with the excess refunded to the technology companies on a pro rata basis.”
  • Data center tax exemptions remain for the biennium.
    Source excerpt
    “Data center tax exemptions will remain for the biennium, but the budget conferees negotiated to include a new energy consumption tax for data centers.”

Source: Cardinal News, 2026-06-22

Prince William County, Virginia · Zoning

DPA2026-00006, Zoning Text Amendment to the Data Center Opportunity Zone Overlay District

pending Sep 9, 2026

  • Prohibits data centers in agricultural, residential, PMR, B-2, B-3 and V districts.
    Source excerpt
    “Agricultural, residential, PMR, B-2, B-3, and V districts.”
  • Requires mechanical equipment to be screened from major roads and residential properties.
    Source excerpt
    “screened from major arterials, interstates and abutting residentially zoned or planned properties.”
  • Prohibits chain-link or barbed wire fencing along street frontages.
    Source excerpt
    “Chain-link fencing or barbed wire fencing are prohibited along public or private street frontages.”
  • Allows data centers up to 1.0 FAR within the overlay.
    Source excerpt
    “up to 1.0 FAR”

Source: Prince William County Planning Office, 2026-09-09

Stafford County, Virginia · Zoning

Ordinance O25-29(R) (data center zoning amendments)

adopted Dec 2, 2025

  • Sets 100-foot setbacks inside Urban Service Areas and 200 feet outside, adjacent to non-commercial/non-industrial zones.
    Source excerpt
    “minimum of 100 feet from property lines adjacent to non-commercial or non-industrial zones within Urban Service Areas; 200 feet for sites outside Urban Service Areas.”
  • Requires sound studies before approval and post-construction evaluations annually for up to 10 years.
    Source excerpt
    “Sound studies are required before final site plan approval and/or CUP. Post-construction noise evaluations are conducted initially within 90 days of occupancy, then annually for up to 10 years.”
  • Requires 30% open space outside Urban Service Areas.
    Source excerpt
    “minimum of 30% open space is required outside Urban Service Areas.”

Source: Stafford County, VA

Prince William County, Virginia · Noise

Prince William County noise ordinance amendment (data centers and industrial uses)

adopted Oct 28, 2025

  • Limits noise in industrial areas to 73 decibels during the day and 68 at night.
    Source excerpt
    “It limits daytime noise in industrial areas to 73 decibels during the day and 68 at night.”
  • Board approved the ordinance 5-2.
    Source excerpt
    “The board voted 5-2 on both issues, with only Supervisor Yesli Vega, of the Coles District, and board Chair Deshundra Jefferson, at large, voting in opposition.”

Source: Prince William Times, 2025-10-30

Loudoun County, Virginia · Zoning

CPAM-2024-0001 and ZOAM-2024-0001 (Data Center Standards & Locations, Phase 1)

adopted Mar 18, 2025

  • Designates data centers as a conditional or Special Exception (SPEX) use in areas where they were previously allowed by-right.
    Source excerpt
    “Phase 1, approved on March 18, 2025, focused on proposed map and text amendments to the Loudoun County 2019 Comprehensive Plan, and amendments to the Loudoun County Zoning Ordinance, to designate data centers as a conditional or Special Exception (SPEX) use in areas where the uses were previously allowed by-right.”

Source: Loudoun County, VA

Fairfax County, Virginia · Zoning

Data center zoning ordinance amendment

adopted Sep 10, 2024

  • Data center buildings must be at least 200 feet from the lot line of an adjacent or abutting residential district or property.
    Source excerpt
    “Data center buildings must be at least 200 feet from the lot line of an adjacent or abutting residential district or property.”
  • Equipment such as backup generators must be 300 feet from residential lot lines or separated from them by the data center building.
    Source excerpt
    “Equipment such as back-up generators must be 300 feet from the lot line of residential property or separated from the lot line of a residential district or residential property by the data center building.”
  • Data centers must be at least one mile from a Metro station.
    Source excerpt
    “Distance from Metro Stations: Data centers must be at least one mile from a Metro station.”
  • In all districts where data centers are allowed, equipment must be enclosed or screened by a wall or similar barrier.
    Source excerpt
    “Equipment Enclosure: In all districts where data centers are allowed, all equipment must be enclosed or screened by a wall or similar barrier to reduce visual and noise impacts.”
  • Pre- and post-construction noise studies are required to ensure compliance with the Noise Ordinance.
    Source excerpt
    “Noise Studies: Pre- and post-construction noise studies must be submitted to ensure compliance with the Noise Ordinance.”

Source: Fairfax County News Center, 2024-09-11

Fauquier County, Virginia · Zoning

Vint Hill zoning text amendment

adopted Mar 2024

  • Buildings or assemblages over 50,000 square feet require a special exception permit from the Board of Supervisors.
    Source excerpt
    “But its main impact will be seen from its declaration that any buildings or assemblages of buildings of more than 50,000 square feet will have to apply for and receive a special exception permit from the Fauquier County Board of Supervisors.”
  • Two projects already in progress (a planned four-building data center complex on Vint Hill Parkway and an expansion of a nearby existing data center) are exempt.
    Source excerpt
    “the board agreed that two projects already in progress — a planned four-building data center complex on Vint Hill Parkway and an expansion of a nearby existing data center — would be exempt from the new rules.”

Source: Prince William Times, 2024-03-17

Loudoun County, Virginia · Noise

Loudoun County Zoning Ordinance maximum sound levels and data center noise study requirements

in effect

  • Sets a 55 dBA maximum sound level at residential property lines.
    Source excerpt
    “For residential properties, the maximum allowable sound level at the property line is 55 dBA”
  • Requires data centers to submit pre- and post-construction noise studies.
    Source excerpt
    “submit a pre-construction noise study at the time of site plan review as well as a post-construction noise study submitted at least one month but no more than 12 months after the issuance of the first Certificate of Occupancy”

Source: Loudoun County, VA

Wisconsin

Wausau, Wisconsin · Zoning

Wausau data center zoning ordinance

proposed Jun 16, 2026

  • Limits data centers to medium and heavy industrial districts with a conditional use permit required.
    Source excerpt
    “data centers would be limited to the city's medium and heavy industrial zoning districts — and even there, none could be built by right. Every proposal would require a conditional use permit”

Source: Wausau Pilot & Review, 2026-07-12

Dane County, Wisconsin · Moratorium

Resolution 2026 RES-039, 18-month moratorium on data center zoning permits

proposed May 26, 2026 · Resolution introduced; county press release May 26, 2026

  • Proposes an 18-month moratorium on applications and zoning permits for data centers.
    Source excerpt
    “An 18-month moratorium on the receipt of applications for, and the issuance of, zoning permits for the siting or placement of data centers in Dane County.”
  • The proposed moratorium would apply only to towns subject to county zoning.
    Source excerpt
    “The moratorium would apply to towns subject to county zoning. It would not apply to cities, villages, or towns that have adopted their own zoning codes.”

Source: Dane County, 2026-05-26

Rules change often. Statuses are as of each source’s date; check with the jurisdiction before relying on one. This tracker lists rules we could confirm in an official document or reputable report and grows every week. Know of one we’re missing? Email corrections@datacentercensus.com with a link to the ordinance or notice. Project-level moratorium actions are also listed on the moratorium tracker.